Khánh Hòa province plans a road of about 26.3 kilometres linking the North–South Expressway with Thành Sơn Airport and the Ninh Chử national tourist area, at a cost of more than 2,000 billion dong, Tuổi Trẻ reported on 18 November.

The Khánh Hòa People's Committee has approved the investment policy. The provincial Project Management Board must now prepare the feasibility study for the competent authority to decide on investment under the Public Investment Law. Work is scheduled for 2026–2030.

The project has two components. The first, about 23.15 kilometres from the expressway to Yên Ninh road, is estimated at about 1,481.3 billion dong. The second, about 3.15 kilometres including Tri Thủy bridge and its approach roads, is estimated at about 618.3 billion dong.

The main line runs about 20.8 kilometres, with three branches totalling about 5.5 kilometres. One branch goes to Gate 2 of Thành Sơn Airport, one to the planned high-speed rail station and a transit-oriented development area, and one to Yên Ninh road.

The road starts at the junction with the expressway's link to National Highway 27, at Km261+730 of the expressway. It ends at Provincial Road 702 and the Ninh Chử bridge in Ninh Chử ward, passing through Đô Vinh, Bảo An, Ninh Chử, Xuân Hải and Ninh Hải.

Tuổi Trẻ says the road is meant to speed passenger travel and freight to the south-central area and the Ninh Chử tourism zone, and to cut traffic on National Highways 27 and 27B.

The report adds that the Prime Minister has agreed in principle to convert Thành Sơn Airport into a dual-use airport, without giving a timeline. The route and costs remain subject to the feasibility study.

Sources

This story was compiled by the Da Nang Voice news desk from the published sources listed above. Facts, figures and quotes are attributed to those sources; Da Nang Voice did not conduct interviews for it unless the text says so. Corrections are dated and noted at the top of the story. Read our corrections policy. Spotted an error? Tell us.